Permeable surfaces let rainwater soak through the surface and a base course into the ground below. Non-permeable surfaces like solid block paving or resin-bound concrete hold water on top and push it away through falls, gullies and drainage. Which one is right for you depends on your plot, your soil, your budget and whether you have a permitted development exemption or need planning consent. For most residential driveways in Derbyshire, a properly built permeable surface is the safer, lower-cost route, but a non-permeable surface can make sense where drainage to a soakaway is not practical.
What “permeable” actually means on a driveway
When a driveway is described as permeable, it means water can pass through the surface layer, the sub-base and the ground below without pooling. The whole system works together. The surface has gaps or joints, the base course is a free-draining aggregate, and the ground underneath is either naturally absorbent soil or an engineered soakaway layer.
A non-permeable surface is the opposite. Water that lands on the drive stays on the surface and has to be carried away by gravity into a channel, a gully, a drain or a soakaway that sits separately from the drive itself. If that drainage path is not designed correctly, water sits on the drive, finds its way into the garden and can end up at the boundary of a neighbour’s plot.
In Derbyshire this matters more than in flatter, sandy coastal areas. Much of the county sits on Mercian mudstone and bunter sandstone, which behave as heavy clay in wet winter months. Water that has nowhere to go sits on the surface. That is why drainage design, not just surface choice, is what determines whether a driveway performs.
The planning angle in Derbyshire and beyond
This is the bit most homeowners miss. In England, if you pave a front or side area where there is currently lawn, gravel or other permeable ground, and you connect that new surface to a public highway or a private drain, the surface has to be permeable or you have to show the water is drained to an appropriate lawful destination. This falls under permitted development guidance, and your local planning authority (for us, Derby City, Derbyshire Dales, Erewash, Ambergate and Vale of Belvoir, North East Derbyshire) will ask for evidence at application time.
What that means in practice:
A solid resin-bonded concrete, asphalt or solid block paved driveway over a front garden almost certainly needs planning permission unless the water is drained to a soakaway that has never been there, or to a private drain with the landowner’s written consent. Permeable options avoid that step entirely because the water soaks into the ground below.
If you are in a Conservation Area, the rules are tighter. Even where permeable, you may need planning permission for a change of surface in the front of the property, and the council will want to see the material, colour and finish before works start.
If you are unsure, a quick check with the planning team at your council costs nothing and saves a lot of rework. We can help with the paperwork side too, because we regularly deal with the same set of questions from homeowners across Derbyshire, Nottinghamshire and Leicestershire.
Permeable surfaces, what they look like
There is a short list of genuinely permeable options. A lot of products marketed as “permeable” are not, so this is worth getting right.
Resin bonded is the most common. Loose aggregate (usually 3 to 6 mm chippings) is held in a UV stable resin and laid over a permeable base. The chippings create a continuous but open surface, so rainwater drops through the joints straight into the base. It is smooth underfoot, low maintenance and comes in a wide range of stone colours. On a residential driveway in the Derby area, this is the surface we most often recommend because it handles a wide range of soil types without a soakaway.
Permeable block paving uses interlocking blocks with open joints filled with a free-draining material rather than sand. The water passes through the joints into the base. The system only works if the joints are genuinely open and the base is free draining, so the base specification matters as much as the blocks.
Permeable concrete or porous concrete is a concrete mix with very little or no fine aggregate, which leaves voids in the surface. It is strong and long lasting, but it needs a specialist concrete supplier and a skilled finish. It is less common on residential drives in the county but is available and worth considering for a high traffic area.
Gravel set on a permeable base is the most straightforward. Loose stone over a well compacted MOT type 1 or 3 base and a layer of ground cloth. It is cheap, easy to maintain and genuinely permeable as long as the ground below can take the water.
Porpave or resin bound gravel in open format is a newer option that works on top of existing solid surfaces. It is not a replacement for a full base, so it only solves the problem where the existing sub-base is already in good condition.
Non-permeable surfaces, and where they work
Resin bound or resin bonded concrete in a solid, dense finish holds water on the surface. It is popular because of the clean, seamless look. On a driveway, it works well where the fall is correct and a drainage route is in place, usually a gully at the low end and a channel to a soakaway or private drain.
Asphalt is the same logic. Strong, low maintenance, cheap to lay in thickness, but water has to be carried away by fall and a drain.
Solid concrete in slabs, or poured in-situ, behaves the same way. It is durable and can be very long lived, but it is fully non-permeable.
Standard block paving with sand joints is non-permeable once the sand settles and is filled with fine material. It only becomes permeable if you specify open joints and a free-draining fill.
Where non-permeable surfaces work well on a residential drive:
Where the plot drains to a private soakaway that has already been installed and inspected. Where the driveway is in the middle or rear of the plot and there is a clear, lawful run to a neighbour’s land with written consent. Where the falls are generous and the drive is small. Where the design of the home is such that a permeable surface simply does not fit the architecture and you are willing to manage the planning side.
The drainage maths you actually need to do
A common mistake is to look at the surface and assume the job is done. The surface is maybe the top 30 mm of the system. The rest is underneath.
On a non-permeable drive, you need to calculate the run off. Roughly, one hour of design rain on a 200 square metre drive will produce a meaningful volume of water. That water has to go somewhere. Either a soakaway sized to the plot, or a drain that connects to a private or public system. In Derbyshire, where much of the ground is clay or heavy bunter, a soakaway has to be sized up considerably larger than on a sandy plot, because the surrounding soil cannot accept water quickly.
On a permeable drive, the calculation is simpler. The surface and base take the water, and the ground below accepts it at a rate that depends on the soil. If the ground below is heavy clay, you may need an extended soakaway layer or a larger granular storage volume under the drive to hold the water while it filters through. We carry out a simple percolation test on site for this reason, because a drive that works in July can fail in a wet January if the base is undersized for the soil.
This is also why a “cheap” permeable drive can quietly cost more than a non-permeable one on a poor soil plot. The base has to be deeper, and the granular storage has to be larger.
What we see on plots in Derbyshire and around
The most common issue on residential drives in the county is the same. Water sits on the drive after rain and then finds a path to the boundary. The fix is almost never the surface. It is the base and the drainage. A second most common issue is a drive that has been laid on top of an old, soft sub-base with no compaction, and the surface fails within two or three winters. A third is a drive where the falls have been set too flat, sometimes two or three millimetres per metre, which is not enough to move water across the surface before it reaches the joint or the gully.
In Nottinghamshire and Leicestershire we see the same patterns, with the same soil types in places and a few sandy pockets where the drainage maths changes. In Staffordshire, particularly the northern parts, the clay is heavier and the soakaway sizing has to be more conservative.
The practical takeaway is that the surface is the visible part of the job, and the base is the part that decides whether the drive lasts.
Cost, in plain terms
We do not print fixed prices here because the variables are too wide, but here is the shape of it.
A permeable drive with resin bonded surface on a prepared base is typically mid range for a residential job. It costs less in planning time and more in base depth on poor soil. A non-permeable drive with asphalt or solid block paving and a gully to a soakaway is typically similar on a small to medium drive, but the soakaway and the drainage work can add a meaningful sum if one is not already in place. A full concrete pour is at the cheaper end of the non-permeable options but has the highest water run off, so the drainage has to be sized accordingly.
If you are not sure which way your plot goes, the cheapest move is a site visit. We survey most residential plots in Derbyshire and the surrounding areas in one visit and can give you a written answer on drainage, surface and a range of options before you commit.
Matching the surface to the house and the garden
This is the part that is not about drainage at all.
A permeable surface, particularly resin bonded, is soft underfoot, looks a little less formal than a solid pour and sits well with a range of garden styles. It is forgiving of small falls because water moves through the joints rather than along the surface. It is the option we recommend for most of the residential work we do.
A non-permeable surface is more formal, more reflective and more “finished” in the short term. It suits homes where the drive is a clear architectural feature, where the falls are generous, and where the drainage is already in place or is being designed as part of the project. It is the wrong choice for a flat, small front garden with no existing drain, because the drainage work to make it legal is often more than the difference in surface cost.
If you are looking at a patio or a paved area off the house as well as the drive, the two surfaces should work together. We do a lot of combined work where the drive is permeable and the patio is a solid, non-permeable surface with its own fall and a gully, and the two systems do not talk to each other. That is the cleanest way to do it.
What to ask before you book any survey
A short list of questions that separates a competent contractor from a general one:
Have you done a percolation test on this plot, and what did it show? What is the proposed base depth, and what is the sub-base specification? Where is the water going, and what is the lawful destination? Is the surface genuinely permeable, or is it a resin over a solid base, which is not the same thing? What is the fall across the surface, in millimetres per metre? Do you handle the planning paperwork, or do I?
If the answers to those are clear and specific, you are in good hands. If the answers are “it drains fine” or “the council will not notice”, walk away.
Our recommendation for most residential plots here
For the majority of homes we survey in Derbyshire, Nottinghamshire, Leicestershire and Staffordshire, a permeable surface on a correctly sized base is the better starting point. It avoids the planning step, it is lower maintenance, it is softer underfoot, and it is the option that ages best on a residential plot. A non-permeable surface is the right call where the design, the falls and the existing drainage make it the natural fit, and where the drainage is either already in place or being engineered as part of the project.
We carry out surveys and give written options for both routes. If you are not sure which one your plot suits, the site visit is where the answer comes from. The surface is the last decision, not the first.
If you are ready to look at the plot, the next step is a free survey. We cover Derbyshire, Nottinghamshire, Leicestershire and Staffordshire, and we can usually fit a visit in within a couple of weeks. You can book through our contact page, or see our driveway services for the full range of surfaces we lay, and our patios if you are combining the drive with a paved area off the house.

