October 12 Patio Installation

A patio laid for a home in Derby, completed on 12 October. The surface was set onto a well-compacted base and laid level and flush, with neat edging around the perimeter to keep it crisp and secure. A solid, level patio built to stay flat and tidy through the winter.

Click on a photo above to zoom in.

Share This Post

More To Explore